Ancon supplied three sizes of shear connectors to the redevelopment of the Melbourne Cricket Ground in Australia. Better known now as the Melbourne MCG, this stadium was the main track and field venue for 2006 Commonwealth Games. This project necessitated the rebuilding of 55% of an existing sportsground.
Construction joints were positioned not only to disect the arc of the stadium and thereby accommodate the inevitable movement, but also to phase the development work. The pour sequence was devised to enable key sporting events to continue to take place at the stadium with a pre-agreed seating capacity.
The two-part installation process of Ancon DSD shear load connectors is quick and accurate; it can prove more cost-effective than the build of more complicated joint details, such as double columns or corbels.
Each connector is a two-part assembly comprising a sleeve and a dowel component. Simple nailing of the sleeve to the formwork ensures subsequent alignment with the dowel assembly: essential where effective movement is required. Drilling of either formwork or concrete is not required. Manufactured from stainless steel, it provides a high degree of corrosion resistance with no requirement for additional protection.
Related Products
Shear Load Connectors
Concrete structures are designed with expansion and contraction joints to allow movement to take place.
Lockable Dowels
Ancon Lockable Dowels are a proven, independently-tested solution which is both easy to detail and install on site.
Latest News
Leviat Launches New 300mm Type 4 Wall Tie for Wider Cavities
Leading construction accessories manufacturer, Leviat, announces the release of its new Ancon Staifix HRT4 300mm Wall Tie designed for use in wider walls with cavities ranging from 151-175mm. The addition of this product to the existing range will help specifiers and builders to meet the latest Part L regulations and achieve the more stringent U-values and building fabric requirements in the upcoming Future Homes Standard.
Enhanced Ancon IHR Head Restraints Now Accommodate 100mm Gaps Due to Customer Demand
Due to customer demand and changes to fire regulations, Leviat have successfully re-engineered the Ancon IHR range of internal head restraints, now accommodating gaps at the wall head of up to 100mm, extending the previous maximum of 75mm.