Skip to content

Eastlink Project, Melbourne

Ancon MBT Headed Anchors have been installed on a section of the Eastlink Project in Melbourne.

EastLink is a AU$3.8 billion road project which will deliver Melbourne's second fully-electronic tollway, comprising about 45 kilometres of freeway-standard road connecting the city's eastern and south-eastern suburbs. Major construction began in early 2005 and the road opened to traffic on Sunday 29 June 2008, five months ahead of the scheduled opening date.

Ancon MBT Headed Anchors are designed to provide dead end embedment for bars in concrete. This helps to reduce congestion and simplify the placement of rebars by removing the need for hooked ends. The anchor comprises half an MBT coupler with a plate welded to one end which carries the full tension load of the bar when it is bearing against the concrete. The MBT Headed Anchor also has the added advantage of requiring no special bar end preparation.

Latest News

New Ancon Molabolt – The Next‑Generation Fixing for Masonry Support Steel Applications.

Leviat is pleased to announce the launch of the Ancon Molabolt, a new high‑performance fixing designed specifically for Ancon masonry support systems and steel fabrications. Developed to deliver exceptional installation speed, improved handling and verified engineering performance, the Ancon Molabolt represents the next evolution in fixing technology for the construction sector.

Leviat Expands Its Range of Non-Combustible Clips

Leviat, leading manufacturer of engineered construction solutions, has launched its second non-combustible clip to the range - the Ancon A1-S Insulation Retaining Clip. This new A1-rated, non-combustible clip has been specifically designed for use with Ancon flat wall ties, including SDB, SD21 and YDB.