Eastlink Project, Melbourne
Ancon MBT Headed Anchors have been installed on a section of the Eastlink Project in Melbourne.
EastLink is a AU$3.8 billion road project which will deliver Melbourne's second fully-electronic tollway, comprising about 45 kilometres of freeway-standard road connecting the city's eastern and south-eastern suburbs. Major construction began in early 2005 and the road opened to traffic on Sunday 29 June 2008, five months ahead of the scheduled opening date.
Ancon MBT Headed Anchors are designed to provide dead end embedment for bars in concrete. This helps to reduce congestion and simplify the placement of rebars by removing the need for hooked ends. The anchor comprises half an MBT coupler with a plate welded to one end which carries the full tension load of the bar when it is bearing against the concrete. The MBT Headed Anchor also has the added advantage of requiring no special bar end preparation.
Related Products
Reinforcing Bar Couplers
Lapped joints are not always an appropriate means of connecting rebar.
Latest News
Leviat Introduces A1-Rated Non-combustible Insulation Retaining Clip for High-Rise Projects
Leviat, global leader in engineered construction solutions, has launched the Ancon A1-ST1 insulation retaining clip, a new non-combustible, A1-rated solution specifically designed to fit the Ancon ST1 heavy duty wall tie widely used in high-rise buildings.
Leviat Sponsors Concrete Society Awards 2025
Leviat is delighted to announce its continued sponsorship of the popular Concrete Society Awards for 2025, taking place on Wednesday 12th November, at London’s Royal Lancaster Hotel.