Ancon supplied three sizes of shear connectors to the redevelopment of the Melbourne Cricket Ground in Australia. Better known now as the Melbourne MCG, this stadium was the main track and field venue for 2006 Commonwealth Games. This project necessitated the rebuilding of 55% of an existing sportsground.

Ancon DSD Shear Load Connector Installed

Construction joints were positioned not only to disect the arc of the stadium and thereby accommodate the inevitable movement, but also to phase the development work. The pour sequence was devised to enable key sporting events to continue to take place at the stadium with a pre-agreed seating capacity.

The two-part installation process of Ancon DSD shear load connectors is quick and accurate; it can prove more cost-effective than the build of more complicated joint details, such as double columns or corbels.

Each connector is a two-part assembly comprising a sleeve and a dowel component. Simple nailing of the sleeve to the formwork ensures subsequent alignment with the dowel assembly: essential where effective movement is required. Drilling of either formwork or concrete is not required. Manufactured from stainless steel, it provides a high degree of corrosion resistance with no requirement for additional protection.

Shear Load Connectors

Concrete structures are designed with expansion and contraction joints to allow movement to take place.

Lockable Dowels

Ancon Lockable Dowels are a proven, independently-tested solution which is both easy to detail and install on site.

Latest News

Leviat to exhibit at London Build 2021

The latest innovative product developments from each of Leviat's established and trusted connecting, fixing, and anchoring brands will be showcased on our stand at London Build 2021.

Leviat proudly sponsors the 2021 Brick Awards

The annual UK Brick Awards are back for 2021, and Leviat is proud to be sponsoring the ‘Large Housing Development’ category, one of the Awards’ most eagerly contested areas.