Astra Turm, Hamburg, Germany

An Ancon Tension System has been used to support a concrete ring weighing over 500 tonnes, which in turn is suspended above an 80 metre high office block.
Ancon Germany offered significant design assistance and supplied a 42mm Ancon Tension Bar System.
The project is now complete and the tower has become one of Hamburg's landmark buildings, with the suspended ring as its distinctive feature.
Related Products

Tension & Compression Systems
Tie bars are increasingly being used in structures and buildings as an architectural as well as a structural element.
Latest News
Ancon 500 Tension System renamed to Halfen Detan-D
As a future-oriented, innovative company Leviat focuses on the ever-changing requirements of the industry, and our latest development combines the portfolio of Ancon and Halfen Tension Systems to ensure we meet the individual requirements of our customers.
Leviat takes a stand for sustainability with ground-breaking engineered products at Futurebuild 2023
Materials, products and services define how our world is built and is why Leviat is gearing up to sponsor and showcase an incredible line-up of innovative solutions from its world leading range of connecting, fixing and anchoring products at Futurebuild 2023.