Skip to content

Steelgrip

To view/download a document, you can either click the link or (windows users) right click the link and choose the 'save target as' option.

Steelgrip
Steelgrip M12 (DWG - 86.8 KB)

Latest News

Leviat ensures HS2 tunnel construction remains on track with the creation of rebar facility

The Skanska Costain STRABAG joint venture (SCS JV) turned to Leviat for training, specialist equipment and ongoing support in order to create an on-site steel threading facility capable of producing the required 92,000 rebar couplers. This innovative and cost-effective rebar facility removes the risk of delays, enables new jobs, reduces lorry movements and cuts waste.