Movement Ties
- PPS
- L0028-00-CA - PPS 150-300mm (PDF - 547 KB)
- L0028-00-CE - PPS 150-300mm (PDF - 545 KB)
- PPS (Pre-Galv)
- L0121-00-CA - PPS (Pre-Galv) 150-300mm (PDF - 398 KB)
- L0121-00-NI - PPS (Pre-Galv) 150-300mm (PDF - 394 KB)
- PPB
- L0029-00-CA - PPB 125-225mm (PDF - 546 KB)
- L0029-00-CE - PPB 125-225mm (PDF - 545 KB)
- PPB (Heavy Duty)
- L0030-00-CA - PPB-HD 125-225mm (PDF - 547 KB)
- L0030-00-NI - PPB-HD 125-225mm (PDF - 543 KB)
- PPV
- L0033-00-CA - PPV 125-225mm (PDF - 547 KB)
- L0033-00-NI - PPV 125-225mm (PDF - 543 KB)
- PP21
- L0038-00-CA - PP21 125-225mm (PDF - 548 KB)
- L0038-00-NI - PP21 125-225mm (PDF - 544 KB)
- PP28
- L0084-00-CA - PP28 125-300mm (PDF - 548 KB)
- L0084-00-NI - PP28 125-300mm (PDF - 543 KB)
- PP30
- L0085-00-CA - PP30 125-300mm (PDF - 548 KB)
- L0085-00-NI - PP30 125-300mm (PDF - 543 KB)
- PP36
- L0115-00-CA - PP36 125-300mm (PDF - 548 KB)
- L0115-00-NI - PP36 125-300mm (PDF - 543 KB)
- PP38
- L0086-00-CA - PP38 125-300mm (PDF - 548 KB)
- L0086-00-NI - PP38 125-300mm (PDF - 544 KB)
Latest News
Construction industry remains open. Manufacturing at Leviat continues through latest national lockdown.
The health, safety and wellbeing of all those who work with us and for us, as well as the general public, is always our No. 1 priority.
CE, UKCA and CE UKNI marking from Leviat
From January 1st 2021, the UK will recognise both the EU CE marking approvals, for a time limited period, and the new UK based approval system, which will be known as the UKCA mark. The EU will only recognise CE marking by EU notified bodies as proof of efficacy moving forwards. Leviat has been working closely with both EU notified and UK approved bodies to ensure compliance is achieved at the earliest possible opportunity and we can confirm that we have obtained all relevant certification.